WebTap the posts into place with a sledgehammer. Drill a ½-inch-diameter screw-shank clearance hole through the ledger board, but not into the sill plate. Position the hole 3 inches below the upper edge of the ledger and … WebFlashing is required at all roof-wall intersections. Either continuous L-metal flashing or step flashing is used to prevent water intrusion into the wall where a sloped roof …
Installing Flashing Between A Patio Cover And House At …
WebJan 6, 2012 · The architectural plans show a patio area which is surrounded on 3 sides by the house – almost like a courtyard. The homeowner would like a no step entry into the house. I believe this is in conflict with the foundation and framing plans which call for a framed floor system on top of the foundation wall. WebWhen it comes to the deck, a strip of flashing is brought down the wall of the house and over the top of the ledger (the piece of dimensional lumber attached to the house at the … strong foundations learning center
Decks are Wildfire-Resistant Building America Solution Center
WebTap the posts into place with a sledgehammer. Drill a ½-inch-diameter screw-shank clearance hole through the ledger board, but not into the sill plate. Position the hole 3 … WebInstall new step and kick-out flashing where an existing roof meets an existing wall as part of a roof replacement. It can also be done as a stand-alone retrofit measure or as part of an exterior wall upgrade. Install and properly integrate flashing at the intersection of an existing wall and roof, as follows: Web2. Install Z-flashing along the top edge of the ledger. The horizontal leg should be wide enough to extend all the way across the edge of the ledger, while the vertical leg should extend upward... strong foundations grant